US Bridges

Maint. RD (u Turn) over Int 8 Ramps Nt & Ts

Good

Mercer County, New Jersey · At Interchange 8 · Structure no. M06747E

Built
2013
12 years old
Condition
Good
inspected April 2023
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
206 ft
2 main spans
Daily traffic
101
2023 count
Owner
Toll Authority
State Toll Authority

About this bridge

Maint. RD (u Turn) over Int 8 Ramps Nt & Ts is a steel continuous stringer/multi-beam or girder carrying Maint. RD (u Turn) over Int 8 Ramps Nt & Ts in Mercer County, New Jersey. It was built in 2013, so it is 12 years old, younger than the New Jersey average of 58.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 101 vehicles a day, roughly 1% of them trucks, projected to reach 127 by 2043. The structure is 206 ft (62.8 m) long and 30 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesMaint. RD (u Turn)
CrossesInt 8 Ramps Nt & Ts
LocationAt Interchange 8
RouteInterstate 95
Coordinates40.26252, -74.5083
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionApril 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry3: Basically intolerable, requiring high priority of corrective action
Approach roadway alignment8: Equal to present desirable criteria
Operating rating78.9 US tons
Inventory rating61.1 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans2
Design loadHL 93
Structure length206 ft (62.8 m)
Longest span120 ft (36.6 m)
Deck width30 ft (9.1 m)
Roadway width26 ft (8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic101 (2023)
Projected traffic127 by 2043
Trucks1%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a toll road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Toll Authority
Maintained byState Toll Authority
Historic statusNot eligible for the National Register of Historic Places
Work proposedWidening of existing bridge without deck rehabilitation
Estimated improvement cost$1.3 million (2017 estimate)
NavigationNot applicable (no waterway)

Frequently asked questions

When was Maint. RD (u Turn) over Int 8 Ramps Nt & Ts built?

It was built in 2013, making it 12 years old in 2025.

What condition is Maint. RD (u Turn) over Int 8 Ramps Nt & Ts in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2023.

How much traffic does Maint. RD (u Turn) over Int 8 Ramps Nt & Ts carry?

About 101 vehicles per day (2023 count), of which roughly 1% are trucks.

How long is Maint. RD (u Turn) over Int 8 Ramps Nt & Ts?

The structure is 206 ft (62.8 m) long with a longest span of 120 ft (36.6 m) and a deck 30 ft wide.

Who owns Maint. RD (u Turn) over Int 8 Ramps Nt & Ts?

It is owned by the State Toll Authority.