US Bridges

Mile 67 U-Turn over Njtp Nso-Nsi-Sni-Sno

Good

Mercer County, New Jersey · 0.71 MI South of Int. 8 · Structure no. M066890

Built
2013
12 years old
Condition
Good
inspected June 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
304 ft
3 main spans
Daily traffic
128
2024 count
Owner
Toll Authority
State Toll Authority

About this bridge

Mile 67 U-Turn over Njtp Nso-Nsi-Sni-Sno is a steel continuous stringer/multi-beam or girder carrying Mile 67 U-Turn over Njtp Nso-Nsi-Sni-Sno in Mercer County, New Jersey. It was built in 2013, so it is 12 years old, younger than the New Jersey average of 58.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 128 vehicles a day, roughly 4% of them trucks, projected to reach 156 by 2044. The structure is 304 ft (92.7 m) long and 30 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesMile 67 U-Turn
CrossesNjtp Nso-Nsi-Sni-Sno
Location0.71 MI South of Int. 8
RouteInterstate 95
Coordinates40.25506, -74.51479
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionJune 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment6: Equal to present minimum criteria
Operating rating65.7 US tons
Inventory rating50.7 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length304 ft (92.7 m)
Longest span129 ft (39.3 m)
Deck width30 ft (9.1 m)
Roadway width26 ft (8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic128 (2024)
Projected traffic156 by 2044
Trucks4%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a toll road
National Highway SystemYes

Ownership and planned work

OwnerState Toll Authority
Maintained byState Toll Authority
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Mile 67 U-Turn over Njtp Nso-Nsi-Sni-Sno built?

It was built in 2013, making it 12 years old in 2025.

What condition is Mile 67 U-Turn over Njtp Nso-Nsi-Sni-Sno in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2024.

How much traffic does Mile 67 U-Turn over Njtp Nso-Nsi-Sni-Sno carry?

About 128 vehicles per day (2024 count), of which roughly 4% are trucks.

How long is Mile 67 U-Turn over Njtp Nso-Nsi-Sni-Sno?

The structure is 304 ft (92.7 m) long with a longest span of 129 ft (39.3 m) and a deck 30 ft wide.

Who owns Mile 67 U-Turn over Njtp Nso-Nsi-Sni-Sno?

It is owned by the State Toll Authority.