US Bridges

I-195 EB over Njtp & Ramp Tp SB to 195

Good

Mercer County, New Jersey · 1.94 MI E of US 130 JCT · Structure no. 1135150

Built
2014
11 years old
Condition
Good
inspected July 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
436 ft
3 main spans
Daily traffic
33,429
2024 count
Owner
State
State Highway Agency

About this bridge

I-195 EB over Njtp & Ramp Tp SB to 195 is a steel continuous stringer/multi-beam or girder carrying I-195 EB over Njtp & Ramp Tp SB to 195 in Mercer County, New Jersey. It was built in 2014, so it is 11 years old, younger than the New Jersey average of 58.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 33,429 vehicles a day, roughly 9% of them trucks, projected to reach 40,115 by 2044. The structure is 436 ft (132.9 m) long and 46 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesI-195 EB
CrossesNjtp & Ramp Tp SB to 195
Location1.94 MI E of US 130 JCT
RouteInterstate 195
Coordinates40.19388, -74.6017
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionJuly 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating50 US tons
Inventory rating38.6 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans3
Design loadHL 93
Structure length436 ft (132.9 m)
Longest span160 ft (48.8 m)
Deck width46 ft (13.9 m)
Roadway width42 ft (12.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic33,429 (2024)
Projected traffic40,115 by 2044
Trucks9%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I-195 EB over Njtp & Ramp Tp SB to 195 built?

It was built in 2014, making it 11 years old in 2025.

What condition is I-195 EB over Njtp & Ramp Tp SB to 195 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in July 2024.

How much traffic does I-195 EB over Njtp & Ramp Tp SB to 195 carry?

About 33,429 vehicles per day (2024 count), of which roughly 9% are trucks.

How long is I-195 EB over Njtp & Ramp Tp SB to 195?

The structure is 436 ft (132.9 m) long with a longest span of 160 ft (48.8 m) and a deck 46 ft wide.

Who owns I-195 EB over Njtp & Ramp Tp SB to 195?

It is owned by the State Highway Agency.