US Bridges

I-78 EB over Leigh Street

Fair

Hunterdon County, New Jersey · .7 MI East of I-78 EXIT15 · Structure no. 1016158

Built
1958
67 years old, rebuilt 1985
Condition
Fair
inspected March 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
62 ft
1 main span
Daily traffic
99,483
2023 count
Owner
State
State Highway Agency

About this bridge

I-78 EB over Leigh Street is a prestressed concrete stringer/multi-beam or girder carrying I-78 EB over Leigh Street in Hunterdon County, New Jersey. It was built in 1958 and reconstructed in 1985, so it is 67 years old, older than the New Jersey average of 58.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 99,483 vehicles a day, roughly 9% of them trucks, projected to reach 121,389 by 2043. The structure is 62 ft (18.9 m) long and 57 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesI-78 EB
CrossesLeigh Street
Location.7 MI East of I-78 EXIT15
RouteInterstate 78
Coordinates40.63373, -74.9075
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure7 GoodSome minor problems.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionMarch 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating46 US tons
Inventory rating27 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadH 20
Structure length62 ft (18.9 m)
Longest span58 ft (17.7 m)
Deck width57 ft (17.4 m)
Roadway width53 ft (16.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic99,483 (2023)
Projected traffic121,389 by 2043
Trucks9%
Lanes on structure3
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I-78 EB over Leigh Street built?

It was built in 1958, making it 67 years old in 2025. It was reconstructed in 1985.

What condition is I-78 EB over Leigh Street in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2023.

How much traffic does I-78 EB over Leigh Street carry?

About 99,483 vehicles per day (2023 count), of which roughly 9% are trucks.

How long is I-78 EB over Leigh Street?

The structure is 62 ft (18.9 m) long with a longest span of 58 ft (17.7 m) and a deck 57 ft wide.

Who owns I-78 EB over Leigh Street?

It is owned by the State Highway Agency.