Lot P1/P3 (bd 60) over Peripheral Ditch
GoodEssex County, New Jersey · 3.3 MI from Nj Tpk Toll · Structure no. 3800066
- Built
- 2018
- 7 years old
- Condition
- Good
- inspected August 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 195 ft
- 3 main spans
- Daily traffic
- 1,730
- 2024 count
- Owner
- Private
- Private (other than railroad)
About this bridge
Lot P1/P3 (bd 60) over Peripheral Ditch is a prestressed concrete stringer/multi-beam or girder carrying Lot P1/P3 (bd 60) over Peripheral Ditch in Essex County, New Jersey. It was built in 2018, so it is 7 years old, younger than the New Jersey average of 58.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 1,730 vehicles a day, roughly 1% of them trucks, projected to reach 2,076 by 2044. The structure is 195 ft (59.4 m) long and 33 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 9 Excellent | No problems noted. |
| Substructure | 9 Excellent | No problems noted. |
| Channel and channel protection | 9 Excellent | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Lot P1/P3 (bd 60) over Peripheral Ditch built?
It was built in 2018, making it 7 years old in 2025.
What condition is Lot P1/P3 (bd 60) over Peripheral Ditch in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2024.
How much traffic does Lot P1/P3 (bd 60) over Peripheral Ditch carry?
About 1,730 vehicles per day (2024 count), of which roughly 1% are trucks.
How long is Lot P1/P3 (bd 60) over Peripheral Ditch?
The structure is 195 ft (59.4 m) long with a longest span of 90 ft (27.4 m) and a deck 33 ft wide.
Who owns Lot P1/P3 (bd 60) over Peripheral Ditch?
It is owned by the Private (other than railroad).