Gsp over CR509 CR506 Second River
FairEssex County, New Jersey · 2.4 Miles North of I-280 · Structure no. 361494T
- Built
- 1954
- 71 years old, rebuilt 2017
- Condition
- Fair
- inspected February 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 560 ft
- 7 main spans
- Daily traffic
- 139,172
- 2024 count
- Owner
- Toll Authority
- State Toll Authority
About this bridge
Gsp over CR509 CR506 Second River is a steel stringer/multi-beam or girder carrying Gsp over CR509 CR506 Second River in Essex County, New Jersey. It was built in 1954 and reconstructed in 2017, so it is 71 years old, older than the New Jersey average of 58.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 139,172 vehicles a day, roughly 1% of them trucks, projected to reach 167,006 by 2044. The structure is 560 ft (170.7 m) long and 95 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Gsp over CR509 CR506 Second River built?
It was built in 1954, making it 71 years old in 2025. It was reconstructed in 2017.
What condition is Gsp over CR509 CR506 Second River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2024.
How much traffic does Gsp over CR509 CR506 Second River carry?
About 139,172 vehicles per day (2024 count), of which roughly 1% are trucks.
How long is Gsp over CR509 CR506 Second River?
The structure is 560 ft (170.7 m) long with a longest span of 94 ft (28.7 m) and a deck 95 ft wide.
Who owns Gsp over CR509 CR506 Second River?
It is owned by the State Toll Authority.