Gsp NB & SB over S Orange Ave
FairEssex County, New Jersey · At Gsp & CO Rt 510 JCT · Structure no. 361461T
- Built
- 1953
- 72 years old
- Condition
- Fair
- inspected July 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 73 ft
- 1 main span
- Daily traffic
- 193,253
- 2023 count
- Owner
- Toll Authority
- State Toll Authority
About this bridge
Gsp NB & SB over S Orange Ave is a steel stringer/multi-beam or girder carrying Gsp NB & SB over S Orange Ave in Essex County, New Jersey. It was built in 1953, so it is 72 years old, older than the New Jersey average of 58.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 193,253 vehicles a day, roughly 1% of them trucks, projected to reach 292,483 by 2043. The structure is 73 ft (22.3 m) long and 118 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Gsp NB & SB over S Orange Ave built?
It was built in 1953, making it 72 years old in 2025.
What condition is Gsp NB & SB over S Orange Ave in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2023.
How much traffic does Gsp NB & SB over S Orange Ave carry?
About 193,253 vehicles per day (2023 count), of which roughly 1% are trucks.
How long is Gsp NB & SB over S Orange Ave?
The structure is 73 ft (22.3 m) long with a longest span of 68 ft (20.7 m) and a deck 118 ft wide.
Who owns Gsp NB & SB over S Orange Ave?
It is owned by the State Toll Authority.