Chancellor Avenue over Garden State Parkway
FairEssex County, New Jersey · 0.8 Miles North of I78 · Structure no. 361437T
- Built
- 1953
- 72 years old, rebuilt 1985
- Condition
- Fair
- inspected August 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 150 ft
- 2 main spans
- Daily traffic
- 9,816
- 2023 count
- Owner
- Toll Authority
- State Toll Authority
About this bridge
Chancellor Avenue over Garden State Parkway is a steel stringer/multi-beam or girder carrying Chancellor Avenue over Garden State Parkway in Essex County, New Jersey. It was built in 1953 and reconstructed in 1985, so it is 72 years old, older than the New Jersey average of 58.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 9,816 vehicles a day, roughly 4% of them trucks, projected to reach 11,977 by 2043. The structure is 150 ft (45.7 m) long and 61 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Chancellor Avenue over Garden State Parkway built?
It was built in 1953, making it 72 years old in 2025. It was reconstructed in 1985.
What condition is Chancellor Avenue over Garden State Parkway in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2023.
How much traffic does Chancellor Avenue over Garden State Parkway carry?
About 9,816 vehicles per day (2023 count), of which roughly 4% are trucks.
How long is Chancellor Avenue over Garden State Parkway?
The structure is 150 ft (45.7 m) long with a longest span of 72 ft (21.9 m) and a deck 61 ft wide.
Who owns Chancellor Avenue over Garden State Parkway?
It is owned by the State Toll Authority.