PROS.AVE(CR577) SB over I-280
FairEssex County, New Jersey · At I-280-CR 577 JCT · Structure no. 0730150
- Built
- 1965
- 60 years old, rebuilt 1996
- Condition
- Fair
- inspected March 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 197 ft
- 2 main spans
- Daily traffic
- 11,965
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
PROS.AVE(CR577) SB over I-280 is a steel stringer/multi-beam or girder carrying PROS.AVE(CR577) SB over I-280 in Essex County, New Jersey. It was built in 1965 and reconstructed in 1996, so it is 60 years old, older than the New Jersey average of 58.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 11,965 vehicles a day, roughly 4% of them trucks, projected to reach 14,599 by 2043. The structure is 197 ft (60 m) long and 49 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was PROS.AVE(CR577) SB over I-280 built?
It was built in 1965, making it 60 years old in 2025. It was reconstructed in 1996.
What condition is PROS.AVE(CR577) SB over I-280 in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2023.
How much traffic does PROS.AVE(CR577) SB over I-280 carry?
About 11,965 vehicles per day (2023 count), of which roughly 4% are trucks.
How long is PROS.AVE(CR577) SB over I-280?
The structure is 197 ft (60 m) long with a longest span of 95 ft (29 m) and a deck 49 ft wide.
Who owns PROS.AVE(CR577) SB over I-280?
It is owned by the State Highway Agency.