US Bridges

Gsp Northbound over Stone Harbor Blvd

Good

Cape May County, New Jersey · 1.1 MI S of Gsp & CR 609 · Structure no. 360099N

Built
2015
10 years old
Condition
Good
inspected May 2023
Type
Stringer/Multi-beam or Girder
Steel
Length
143 ft
1 main span
Daily traffic
15,467
2023 count
Owner
Toll Authority
State Toll Authority

About this bridge

Gsp Northbound over Stone Harbor Blvd is a steel stringer/multi-beam or girder carrying Gsp Northbound over Stone Harbor Blvd in Cape May County, New Jersey. It was built in 2015, so it is 10 years old, younger than the New Jersey average of 58.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 15,467 vehicles a day, roughly 3% of them trucks, projected to reach 14,830 by 2043. The structure is 143 ft (43.6 m) long and 52 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesGsp Northbound
CrossesStone Harbor Blvd
Location1.1 MI S of Gsp & CR 609
Coordinates39.08496, -74.81517
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure9 ExcellentNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionMay 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating88.2 US tons
Inventory rating68.2 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length143 ft (43.6 m)
Longest span140 ft (42.7 m)
Deck width52 ft (15.8 m)
Roadway width48 ft (14.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic15,467 (2023)
Projected traffic14,830 by 2043
Trucks3%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a toll road
National Highway SystemYes

Ownership and planned work

OwnerState Toll Authority
Maintained byState Toll Authority
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Gsp Northbound over Stone Harbor Blvd built?

It was built in 2015, making it 10 years old in 2025.

What condition is Gsp Northbound over Stone Harbor Blvd in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in May 2023.

How much traffic does Gsp Northbound over Stone Harbor Blvd carry?

About 15,467 vehicles per day (2023 count), of which roughly 3% are trucks.

How long is Gsp Northbound over Stone Harbor Blvd?

The structure is 143 ft (43.6 m) long with a longest span of 140 ft (42.7 m) and a deck 52 ft wide.

Who owns Gsp Northbound over Stone Harbor Blvd?

It is owned by the State Toll Authority.