US Bridges

I-676 over Pine Street

Fair

Camden County, New Jersey · .62 MI South of US 30 · Structure no. 0430150

Built
1971
54 years old, rebuilt 2008
Condition
Fair
inspected June 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
68 ft
1 main span
Daily traffic
78,518
2024 count
Owner
State
State Highway Agency

About this bridge

I-676 over Pine Street is a steel stringer/multi-beam or girder carrying I-676 over Pine Street in Camden County, New Jersey. It was built in 1971 and reconstructed in 2008, so it is 54 years old, younger than the New Jersey average of 58.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 78,518 vehicles a day, roughly 9% of them trucks, projected to reach 94,221 by 2044. The structure is 68 ft (20.7 m) long and 120 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesI-676
CrossesPine Street
Location.62 MI South of US 30
RouteInterstate 676
Coordinates39.93696, -75.11171
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionJune 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating75.9 US tons
Inventory rating45 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20 + Mod
Structure length68 ft (20.7 m)
Longest span63 ft (19.2 m)
Deck width120 ft (36.6 m)
Roadway width114 ft (34.8 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic78,518 (2024)
Projected traffic94,221 by 2044
Trucks9%
Lanes on structure8
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I-676 over Pine Street built?

It was built in 1971, making it 54 years old in 2025. It was reconstructed in 2008.

What condition is I-676 over Pine Street in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2024.

How much traffic does I-676 over Pine Street carry?

About 78,518 vehicles per day (2024 count), of which roughly 9% are trucks.

How long is I-676 over Pine Street?

The structure is 68 ft (20.7 m) long with a longest span of 63 ft (19.2 m) and a deck 120 ft wide.

Who owns I-676 over Pine Street?

It is owned by the State Highway Agency.