US Bridges

I-76 over I-295 SB (ramp C )

Fair

Camden County, New Jersey · I-76 & I-295 Jct. · Structure no. 0417151

Built
1958
67 years old, rebuilt 2011
Condition
Fair
inspected September 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
65 ft
1 main span
Daily traffic
197,880
2023 count
Owner
State
State Highway Agency

About this bridge

I-76 over I-295 SB (ramp C ) is a prestressed concrete stringer/multi-beam or girder carrying I-76 over I-295 SB (ramp C ) in Camden County, New Jersey. It was built in 1958 and reconstructed in 2011, so it is 67 years old, older than the New Jersey average of 58.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 197,880 vehicles a day, roughly 9% of them trucks, projected to reach 241,451 by 2043. The structure is 65 ft (19.8 m) long and 222 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesI-76
CrossesI-295 SB (ramp C )
LocationI-76 & I-295 Jct.
RouteInterstate 76
Coordinates39.87841, -75.10313
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionSeptember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60.4 US tons
Inventory rating39.7 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length65 ft (19.8 m)
Longest span61 ft (18.6 m)
Deck width222 ft (67.8 m)
Roadway width200 ft (61 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic197,880 (2023)
Projected traffic241,451 by 2043
Trucks9%
Lanes on structure13
Traffic directionTwo-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedOther structural work, including hydraulic replacements
Estimated improvement cost$2,000 (2023 estimate)
NavigationNot applicable (no waterway)

Frequently asked questions

When was I-76 over I-295 SB (ramp C ) built?

It was built in 1958, making it 67 years old in 2025. It was reconstructed in 2011.

What condition is I-76 over I-295 SB (ramp C ) in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2023.

How much traffic does I-76 over I-295 SB (ramp C ) carry?

About 197,880 vehicles per day (2023 count), of which roughly 9% are trucks.

How long is I-76 over I-295 SB (ramp C )?

The structure is 65 ft (19.8 m) long with a longest span of 61 ft (18.6 m) and a deck 222 ft wide.

Who owns I-76 over I-295 SB (ramp C )?

It is owned by the State Highway Agency.