Route I-295 SB over W Burlington ST (co 662)

Fair

Burlington County, New Jersey · 0.45 MI N of 295 Exit 57 · Structure no. 0328172

Built
1973
52 years old, rebuilt 1994
Condition
Fair
inspected March 2023
Type
Stringer/Multi-beam or Girder
Steel
Length
97 ft
1 main span
Daily traffic
41,290
2023 count
Owner
State
State Highway Agency

About this bridge

Route I-295 SB over W Burlington ST (co 662) is a steel stringer/multi-beam or girder carrying Route I-295 SB over W Burlington ST (co 662) in Burlington County, New Jersey. It was built in 1973 and reconstructed in 1994, so it is 52 years old, younger than the New Jersey average of 58.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 41,290 vehicles a day, roughly 9% of them trucks, projected to reach 50,381 by 2043. The structure is 97 ft (29.6 m) long and 58 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesRoute I-295 SB
CrossesW Burlington ST (co 662)
Location0.45 MI N of 295 Exit 57
RouteInterstate 295
Coordinates40.14167, -74.71778
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionMarch 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating97 US tons
Inventory rating58 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20 + Mod
Structure length97 ft (29.6 m)
Longest span93 ft (28.3 m)
Deck width58 ft (17.6 m)
Roadway width54 ft (16.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic41,290 (2023)
Projected traffic50,381 by 2043
Trucks9%
Lanes on structure3
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Route I-295 SB over W Burlington ST (co 662) built?

It was built in 1973, making it 52 years old in 2025. It was reconstructed in 1994.

What condition is Route I-295 SB over W Burlington ST (co 662) in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2023.

How much traffic does Route I-295 SB over W Burlington ST (co 662) carry?

About 41,290 vehicles per day (2023 count), of which roughly 9% are trucks.

How long is Route I-295 SB over W Burlington ST (co 662)?

The structure is 97 ft (29.6 m) long with a longest span of 93 ft (28.3 m) and a deck 58 ft wide.

Who owns Route I-295 SB over W Burlington ST (co 662)?

It is owned by the State Highway Agency.