US Bridges

Pip Ramp to Gwb over I-95 NB (lower Level Eb)

Good

Bergen County, New Jersey · 0.15 Mi. West of the Gwb · Structure no. 3800079

Built
2019
6 years old
Condition
Good
inspected June 2023
Type
Stringer/Multi-beam or Girder
Steel
Length
113 ft
1 main span
Daily traffic
36,112
2023 count
Owner
Toll Authority
State Toll Authority

About this bridge

Pip Ramp to Gwb over I-95 NB (lower Level Eb) is a steel stringer/multi-beam or girder carrying Pip Ramp to Gwb over I-95 NB (lower Level Eb) in Bergen County, New Jersey. It was built in 2019, so it is 6 years old, younger than the New Jersey average of 58.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 36,112 vehicles a day, projected to reach 47,736 by 2043. The structure is 113 ft (34.4 m) long and 41 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesPip Ramp to Gwb
CrossesI-95 NB (lower Level Eb)
Location0.15 Mi. West of the Gwb
Coordinates40.85346, -73.96459
Functional classUrban Principal Arterial - Other Freeway or Expressway

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionJune 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry9: Superior to present desirable criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating97.6 US tons
Inventory rating75.4 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadHL 93
Structure length113 ft (34.4 m)
Longest span108 ft (32.9 m)
Deck width41 ft (12.5 m)
Roadway width31 ft (9.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic36,112 (2023)
Projected traffic47,736 by 2043
Trucks—
Lanes on structure1
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a toll road
National Highway SystemYes

Ownership and planned work

OwnerState Toll Authority
Maintained byPrivate (other than railroad)
Historic statusHistorical significance not determinable at this time
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was Pip Ramp to Gwb over I-95 NB (lower Level Eb) built?

It was built in 2019, making it 6 years old in 2025.

What condition is Pip Ramp to Gwb over I-95 NB (lower Level Eb) in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2023.

How much traffic does Pip Ramp to Gwb over I-95 NB (lower Level Eb) carry?

About 36,112 vehicles per day (2023 count).

How long is Pip Ramp to Gwb over I-95 NB (lower Level Eb)?

The structure is 113 ft (34.4 m) long with a longest span of 108 ft (32.9 m) and a deck 41 ft wide.

Who owns Pip Ramp to Gwb over I-95 NB (lower Level Eb)?

It is owned by the State Toll Authority and maintained by the Private (other than railroad).