Garden ST Pkwy NB over Int. 163 Ramp Sbx
GoodBergen County, New Jersey · At Gsp & Nj 17 Junction · Structure no. 371630N
- Built
- 2016
- 9 years old
- Condition
- Good
- inspected April 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 154 ft
- 1 main span
- Daily traffic
- 26,969
- 2024 count
- Owner
- Toll Authority
- State Toll Authority
About this bridge
Garden ST Pkwy NB over Int. 163 Ramp Sbx is a steel stringer/multi-beam or girder carrying Garden ST Pkwy NB over Int. 163 Ramp Sbx in Bergen County, New Jersey. It was built in 2016, so it is 9 years old, younger than the New Jersey average of 58.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 26,969 vehicles a day, roughly 1% of them trucks, projected to reach 32,907 by 2044. The structure is 154 ft (46.9 m) long and 70 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Garden ST Pkwy NB over Int. 163 Ramp Sbx built?
It was built in 2016, making it 9 years old in 2025.
What condition is Garden ST Pkwy NB over Int. 163 Ramp Sbx in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2024.
How much traffic does Garden ST Pkwy NB over Int. 163 Ramp Sbx carry?
About 26,969 vehicles per day (2024 count), of which roughly 1% are trucks.
How long is Garden ST Pkwy NB over Int. 163 Ramp Sbx?
The structure is 154 ft (46.9 m) long with a longest span of 149 ft (45.4 m) and a deck 70 ft wide.
Who owns Garden ST Pkwy NB over Int. 163 Ramp Sbx?
It is owned by the State Toll Authority.