Garden ST Prkwy NB over Summit Avenue (cr 96)
FairBergen County, New Jersey · 8.3 MI W of Gsp&nj 17 JCT · Structure no. 361717N
- Built
- 1956
- 69 years old
- Condition
- Fair
- inspected April 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 66 ft
- 1 main span
- Daily traffic
- 19,051
- 2024 count
- Owner
- Toll Authority
- State Toll Authority
About this bridge
Garden ST Prkwy NB over Summit Avenue (cr 96) is a prestressed concrete stringer/multi-beam or girder carrying Garden ST Prkwy NB over Summit Avenue (cr 96) in Bergen County, New Jersey. It was built in 1956, so it is 69 years old, older than the New Jersey average of 58.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 19,051 vehicles a day, roughly 1% of them trucks, projected to reach 22,861 by 2044. The structure is 66 ft (20.1 m) long and 45 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Garden ST Prkwy NB over Summit Avenue (cr 96) built?
It was built in 1956, making it 69 years old in 2025.
What condition is Garden ST Prkwy NB over Summit Avenue (cr 96) in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2024.
How much traffic does Garden ST Prkwy NB over Summit Avenue (cr 96) carry?
About 19,051 vehicles per day (2024 count), of which roughly 1% are trucks.
How long is Garden ST Prkwy NB over Summit Avenue (cr 96)?
The structure is 66 ft (20.1 m) long with a longest span of 60 ft (18.3 m) and a deck 45 ft wide.
Who owns Garden ST Prkwy NB over Summit Avenue (cr 96)?
It is owned by the State Toll Authority.