Garden ST Pkwy SB over Paramus Road (cr 62)
GoodBergen County, New Jersey · 0.5 MI SW of Gsp& NJ4 JCT · Structure no. 361615S
- Built
- 1956
- 69 years old, rebuilt 2022
- Condition
- Good
- inspected April 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 139 ft
- 3 main spans
- Daily traffic
- 60,866
- 2024 count
- Owner
- Toll Authority
- State Toll Authority
About this bridge
Garden ST Pkwy SB over Paramus Road (cr 62) is a steel stringer/multi-beam or girder carrying Garden ST Pkwy SB over Paramus Road (cr 62) in Bergen County, New Jersey. It was built in 1956 and reconstructed in 2022, so it is 69 years old, older than the New Jersey average of 58.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 60,866 vehicles a day, roughly 1% of them trucks, projected to reach 74,268 by 2044. The structure is 139 ft (42.4 m) long and 54 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 8 Very Good | No problems noted. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Garden ST Pkwy SB over Paramus Road (cr 62) built?
It was built in 1956, making it 69 years old in 2025. It was reconstructed in 2022.
What condition is Garden ST Pkwy SB over Paramus Road (cr 62) in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2024.
How much traffic does Garden ST Pkwy SB over Paramus Road (cr 62) carry?
About 60,866 vehicles per day (2024 count), of which roughly 1% are trucks.
How long is Garden ST Pkwy SB over Paramus Road (cr 62)?
The structure is 139 ft (42.4 m) long with a longest span of 70 ft (21.3 m) and a deck 54 ft wide.
Who owns Garden ST Pkwy SB over Paramus Road (cr 62)?
It is owned by the State Toll Authority.