US Bridges

Orient Way CR 130 over Main Line M.P. 7.23

Fair

Bergen County, New Jersey · 2.15MI NW of I-95&NJ3 JCT · Structure no. 0265151

Built
1903
122 years old, rebuilt 1999
Condition
Fair
inspected February 2023
Type
Culvert
Concrete
Length
28 ft
1 main span
Daily traffic
20,665
2023 count
Owner
Unknown
Unknown

About this bridge

Orient Way CR 130 over Main Line M.P. 7.23 is a concrete culvert carrying Orient Way CR 130 over Main Line M.P. 7.23 in Bergen County, New Jersey. It was built in 1903 and reconstructed in 1999, so it is 122 years old, older than the New Jersey average of 58.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 20,665 vehicles a day, roughly 4% of them trucks, projected to reach 27,840 by 2043. The structure is 28 ft (8.5 m) long. If it were closed, the detour would be 1.2 mi (2 km).

CarriesOrient Way CR 130
CrossesMain Line M.P. 7.23
Location2.15MI NW of I-95&NJ3 JCT
RouteCounty Highway 130
Coordinates40.80524, -74.11333
Functional classUrban Minor Arterial

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Culvert6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionFebruary 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating59 US tons
Inventory rating35.1 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans1
Design loadUnknown
Structure length28 ft (8.5 m)
Longest span28 ft (8.5 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic20,665 (2023)
Projected traffic27,840 by 2043
Trucks4%
Lanes on structure5
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesRailroad
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerUnknown
Maintained byOther State Agency
Historic statusHistorical significance not determinable at this time
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$26.1 million (2023 estimate)
NavigationNot applicable (no waterway)

Frequently asked questions

When was Orient Way CR 130 over Main Line M.P. 7.23 built?

It was built in 1903, making it 122 years old in 2025. It was reconstructed in 1999.

What condition is Orient Way CR 130 over Main Line M.P. 7.23 in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2023.

How much traffic does Orient Way CR 130 over Main Line M.P. 7.23 carry?

About 20,665 vehicles per day (2023 count), of which roughly 4% are trucks.

How long is Orient Way CR 130 over Main Line M.P. 7.23?

The structure is 28 ft (8.5 m) long with a longest span of 28 ft (8.5 m).

Who owns Orient Way CR 130 over Main Line M.P. 7.23?

It is owned by the Unknown and maintained by the Other State Agency.