US Bridges

Orient Way over Nj 3

Good

Bergen County, New Jersey · 0.4 MI W of Nj 17 Jct. · Structure no. 0203153

Built
1948
77 years old, rebuilt 2020
Condition
Good
inspected September 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
147 ft
2 main spans
Daily traffic
10,105
2024 count
Owner
State
State Highway Agency

About this bridge

Orient Way over Nj 3 is a steel continuous stringer/multi-beam or girder carrying Orient Way over Nj 3 in Bergen County, New Jersey. It was built in 1948 and reconstructed in 2020, so it is 77 years old, older than the New Jersey average of 58.5 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 10,105 vehicles a day, roughly 4% of them trucks, projected to reach 12,125 by 2044. The structure is 147 ft (44.8 m) long and 81 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesOrient Way
CrossesNj 3
Location0.4 MI W of Nj 17 Jct.
RouteCity Street 0
Coordinates40.81435, -74.10887
Functional classUrban Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure7 GoodSome minor problems.
Last inspectionSeptember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating55.3 US tons
Inventory rating42.9 US tons

Structure

MaterialSteel Continuous
DeckConcrete, precast panels
Main spans2
Design loadHL 93
Structure length147 ft (44.8 m)
Longest span75 ft (22.9 m)
Deck width81 ft (24.8 m)
Roadway width60 ft (18.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic10,105 (2024)
Projected traffic12,125 by 2044
Trucks4%
Lanes on structure4
Traffic directionTwo-way traffic
CarriesHighway and pedestrian
CrossesHighway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusHistorical significance not determinable at this time
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost$8,000 (2020 estimate)
NavigationNot applicable (no waterway)

Frequently asked questions

When was Orient Way over Nj 3 built?

It was built in 1948, making it 77 years old in 2025. It was reconstructed in 2020.

What condition is Orient Way over Nj 3 in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2024.

How much traffic does Orient Way over Nj 3 carry?

About 10,105 vehicles per day (2024 count), of which roughly 4% are trucks.

How long is Orient Way over Nj 3?

The structure is 147 ft (44.8 m) long with a longest span of 75 ft (22.9 m) and a deck 81 ft wide.

Who owns Orient Way over Nj 3?

It is owned by the State Highway Agency.