Gsp NB over A.C. Reservoir Flume
FairAtlantic County, New Jersey · At Atlantic City Resevoir · Structure no. 360393N
- Built
- 1954
- 71 years old, rebuilt 2015
- Condition
- Fair
- inspected March 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 76 ft
- 1 main span
- Daily traffic
- 16,928
- 2023 count
- Owner
- Toll Authority
- State Toll Authority
About this bridge
Gsp NB over A.C. Reservoir Flume is a steel stringer/multi-beam or girder carrying Gsp NB over A.C. Reservoir Flume in Atlantic County, New Jersey. It was built in 1954 and reconstructed in 2015, so it is 71 years old, older than the New Jersey average of 58.5 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 16,928 vehicles a day, roughly 3% of them trucks, projected to reach 36,306 by 2043. The structure is 76 ft (23.2 m) long and 64 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Gsp NB over A.C. Reservoir Flume built?
It was built in 1954, making it 71 years old in 2025. It was reconstructed in 2015.
What condition is Gsp NB over A.C. Reservoir Flume in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in March 2023.
How much traffic does Gsp NB over A.C. Reservoir Flume carry?
About 16,928 vehicles per day (2023 count), of which roughly 3% are trucks.
How long is Gsp NB over A.C. Reservoir Flume?
The structure is 76 ft (23.2 m) long with a longest span of 70 ft (21.3 m) and a deck 64 ft wide.
Who owns Gsp NB over A.C. Reservoir Flume?
It is owned by the State Toll Authority.