NH202A over Cocheco River
FairStrafford County, New Hampshire · 1.2 MI from JCT Rt 16 · Structure no. 022201270010600
- Built
- 1883
- 142 years old, rebuilt 2012
- Condition
- Fair
- inspected August 2024
- Type
- Arch - Deck
- Masonry
- Length
- 133 ft
- 3 main spans
- Daily traffic
- 14,115
- 2023 count
- Owner
- City
- City or Municipal Highway Agency
About this bridge
NH202A over Cocheco River is a masonry arch - deck carrying NH202A over Cocheco River in Strafford County, New Hampshire. It was built in 1883 and reconstructed in 2012, so it is 142 years old, older than the New Hampshire average of 56.9 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 14,115 vehicles a day, roughly 5% of them trucks, projected to reach 20,890 by 2043. The structure is 133 ft (40.5 m) long and 51 ft wide. If it were closed, the detour would be 3.1 mi (5 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was NH202A over Cocheco River built?
It was built in 1883, making it 142 years old in 2025. It was reconstructed in 2012.
What condition is NH202A over Cocheco River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2024.
How much traffic does NH202A over Cocheco River carry?
About 14,115 vehicles per day (2023 count), of which roughly 5% are trucks.
How long is NH202A over Cocheco River?
The structure is 133 ft (40.5 m) long with a longest span of 28 ft (8.5 m) and a deck 51 ft wide.
Who owns NH202A over Cocheco River?
It is owned by the City or Municipal Highway Agency.