US30/US81 over Park Subway
FairPlatte County, Nebraska · In Columbus · Structure no. S030 37787
- Built
- 1931
- 94 years old, rebuilt 1984
- Condition
- Fair
- inspected June 2023
- Type
- Tee Beam
- Concrete
- Length
- 27 ft
- 1 main span
- Daily traffic
- 15,600
- 2018 count
- Owner
- State
- State Highway Agency
About this bridge
US30/US81 over Park Subway is a concrete tee beam carrying US30/US81 over Park Subway in Platte County, Nebraska. It was built in 1931 and reconstructed in 1984, so it is 94 years old, older than the Nebraska average of 47.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 15,600 vehicles a day, roughly 8% of them trucks, projected to reach 23,400 by 2038. The structure is 27 ft (8.2 m) long and 88 ft wide. If it were closed, the detour would be 217.5 mi (350 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was US30/US81 over Park Subway built?
It was built in 1931, making it 94 years old in 2025. It was reconstructed in 1984.
What condition is US30/US81 over Park Subway in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2023.
How much traffic does US30/US81 over Park Subway carry?
About 15,600 vehicles per day (2018 count), of which roughly 8% are trucks.
How long is US30/US81 over Park Subway?
The structure is 27 ft (8.2 m) long with a longest span of 24 ft (7.3 m) and a deck 88 ft wide.
Who owns US30/US81 over Park Subway?
It is owned by the State Highway Agency.