Nucor RD over Hadar Creek Trib
FairPosted for loadMadison County, Nebraska · JCT US81/US275B 3N 2.2W · Structure no. C005910405
- Built
- 1935
- 90 years old
- Condition
- Fair
- inspected December 2023
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 40 ft
- 1 main span
- Daily traffic
- 80
- 1998 count
- Owner
- County
- County Highway Agency
About this bridge
Nucor RD over Hadar Creek Trib is a steel stringer/multi-beam or girder carrying Nucor RD over Hadar Creek Trib in Madison County, Nebraska. It was built in 1935, so it is 90 years old, older than the Nebraska average of 47.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 80 vehicles a day, projected to reach 80 by 2033. The structure is 40 ft (12.2 m) long and 20 ft wide. If it were closed, the detour would be 31.1 mi (50 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Nucor RD over Hadar Creek Trib built?
It was built in 1935, making it 90 years old in 2025.
What condition is Nucor RD over Hadar Creek Trib in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in December 2023.
How much traffic does Nucor RD over Hadar Creek Trib carry?
About 80 vehicles per day (1998 count).
How long is Nucor RD over Hadar Creek Trib?
The structure is 40 ft (12.2 m) long with a longest span of 39 ft (11.9 m) and a deck 20 ft wide.
Who owns Nucor RD over Hadar Creek Trib?
It is owned by the County Highway Agency.