US Bridges

Center St/Fas 2950 over Hadar Creek

Good

Pierce County, Nebraska · In Hadar · Structure no. M1090D3905

Built
1981
44 years old
Condition
Good
inspected September 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
71 ft
1 main span
Daily traffic
390
2011 count
Owner
City
City or Municipal Highway Agency

About this bridge

Center St/Fas 2950 over Hadar Creek is a steel stringer/multi-beam or girder carrying Center St/Fas 2950 over Hadar Creek in Pierce County, Nebraska. It was built in 1981, so it is 44 years old, younger than the Nebraska average of 47.1 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 390 vehicles a day, projected to reach 390 by 2033. The structure is 71 ft (21.6 m) long and 32 ft wide. If it were closed, the detour would be 18.6 mi (30 km).

CarriesCenter St/Fas 2950
CrossesHadar Creek
LocationIn Hadar
RouteCity Street 2925
Coordinates42.1019, -97.4512
Functional classRural Major Collector

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionSeptember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation6: Equal to present minimum criteria
Deck geometry6: Equal to present minimum criteria
Waterway adequacy9: Superior to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating40.8 US tons
Inventory rating24.3 US tons

Structure

MaterialSteel
DeckConcrete, cast-in-place
Main spans1
Design loadH 20
Structure length71 ft (21.6 m)
Longest span68 ft (20.7 m)
Deck width32 ft (9.9 m)
Roadway width30 ft (9.1 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic390 (2011)
Projected traffic390 by 2033
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed18.6 mi (30 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCity or Municipal Highway Agency
Maintained byCity or Municipal Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Center St/Fas 2950 over Hadar Creek built?

It was built in 1981, making it 44 years old in 2025.

What condition is Center St/Fas 2950 over Hadar Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in September 2024.

How much traffic does Center St/Fas 2950 over Hadar Creek carry?

About 390 vehicles per day (2011 count).

How long is Center St/Fas 2950 over Hadar Creek?

The structure is 71 ft (21.6 m) long with a longest span of 68 ft (20.7 m) and a deck 32 ft wide.

Who owns Center St/Fas 2950 over Hadar Creek?

It is owned by the City or Municipal Highway Agency.