SW 128th ST over Olive Branch CR (V025)
FairLancaster County, Nebraska · .5S 1W of Kramer · Structure no. C005500305
- Built
- 1954
- 71 years old, rebuilt 2021
- Condition
- Fair
- inspected April 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 32 ft
- 1 main span
- Daily traffic
- 49
- 2015 count
- Owner
- County
- County Highway Agency
About this bridge
SW 128th ST over Olive Branch CR (V025) is a steel stringer/multi-beam or girder carrying SW 128th ST over Olive Branch CR (V025) in Lancaster County, Nebraska. It was built in 1954 and reconstructed in 2021, so it is 71 years old, older than the Nebraska average of 47.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 49 vehicles a day, projected to reach 83 by 2040. The structure is 32 ft (9.8 m) long and 24 ft wide. If it were closed, the detour would be 18.6 mi (30 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was SW 128th ST over Olive Branch CR (V025) built?
It was built in 1954, making it 71 years old in 2025. It was reconstructed in 2021.
What condition is SW 128th ST over Olive Branch CR (V025) in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2024.
How much traffic does SW 128th ST over Olive Branch CR (V025) carry?
About 49 vehicles per day (2015 count).
How long is SW 128th ST over Olive Branch CR (V025)?
The structure is 32 ft (9.8 m) long with a longest span of 31 ft (9.4 m) and a deck 24 ft wide.
Who owns SW 128th ST over Olive Branch CR (V025)?
It is owned by the County Highway Agency.