WB-I80 Brg #7W over Sb-Cd East & Ramp 10
FairDouglas County, Nebraska · In Omaha · Structure no. S080 44606L
- Built
- 1995
- 30 years old, rebuilt 2015
- Condition
- Fair
- inspected February 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 219 ft
- 2 main spans
- Daily traffic
- 169,605
- 2018 count
- Owner
- State
- State Highway Agency
About this bridge
WB-I80 Brg #7W over Sb-Cd East & Ramp 10 is a steel continuous stringer/multi-beam or girder carrying WB-I80 Brg #7W over Sb-Cd East & Ramp 10 in Douglas County, Nebraska. It was built in 1995 and reconstructed in 2015, so it is 30 years old, younger than the Nebraska average of 47.1 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 169,605 vehicles a day, roughly 7% of them trucks, projected to reach 254,408 by 2038. The structure is 219 ft (66.8 m) long and 52 ft wide. If it were closed, the detour would be 31.1 mi (50 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was WB-I80 Brg #7W over Sb-Cd East & Ramp 10 built?
It was built in 1995, making it 30 years old in 2025. It was reconstructed in 2015.
What condition is WB-I80 Brg #7W over Sb-Cd East & Ramp 10 in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in February 2024.
How much traffic does WB-I80 Brg #7W over Sb-Cd East & Ramp 10 carry?
About 169,605 vehicles per day (2018 count), of which roughly 7% are trucks.
How long is WB-I80 Brg #7W over Sb-Cd East & Ramp 10?
The structure is 219 ft (66.8 m) long with a longest span of 120 ft (36.6 m) and a deck 52 ft wide.
Who owns WB-I80 Brg #7W over Sb-Cd East & Ramp 10?
It is owned by the State Highway Agency.