Nd Highway 59 over I-29/PEMBINA Interchange
FairPembina County, North Dakota · JCT Nd Highway 59 · Structure no. 0029215237
- Built
- 1959
- 66 years old, rebuilt 1989
- Condition
- Fair
- inspected November 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete Continuous
- Length
- 244 ft
- 4 main spans
- Daily traffic
- 1,330
- 2019 count
- Owner
- State
- State Highway Agency
About this bridge
Nd Highway 59 over I-29/PEMBINA Interchange is a prestressed concrete continuous stringer/multi-beam or girder carrying Nd Highway 59 over I-29/PEMBINA Interchange in Pembina County, North Dakota. It was built in 1959 and reconstructed in 1989, so it is 66 years old, older than the North Dakota average of 48.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 1,330 vehicles a day, roughly 26% of them trucks, projected to reach 1,330 by 2039. The structure is 244 ft (74.4 m) long and 47 ft wide. If it were closed, the detour would be 6.2 mi (10 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Nd Highway 59 over I-29/PEMBINA Interchange built?
It was built in 1959, making it 66 years old in 2025. It was reconstructed in 1989.
What condition is Nd Highway 59 over I-29/PEMBINA Interchange in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2023.
How much traffic does Nd Highway 59 over I-29/PEMBINA Interchange carry?
About 1,330 vehicles per day (2019 count), of which roughly 26% are trucks.
How long is Nd Highway 59 over I-29/PEMBINA Interchange?
The structure is 244 ft (74.4 m) long with a longest span of 58 ft (17.7 m) and a deck 47 ft wide.
Who owns Nd Highway 59 over I-29/PEMBINA Interchange?
It is owned by the State Highway Agency.