US Bridges

County Highway over I29/NECHE Interchange

Fair

Pembina County, North Dakota · 3 South of Nd 59 · Structure no. 0029212717

Built
1959
66 years old, rebuilt 1994
Condition
Fair
inspected November 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete Continuous
Length
245 ft
4 main spans
Daily traffic
80
2019 count
Owner
State
State Highway Agency

About this bridge

County Highway over I29/NECHE Interchange is a prestressed concrete continuous stringer/multi-beam or girder carrying County Highway over I29/NECHE Interchange in Pembina County, North Dakota. It was built in 1959 and reconstructed in 1994, so it is 66 years old, older than the North Dakota average of 48.2 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 80 vehicles a day, projected to reach 80 by 2039. The structure is 245 ft (74.7 m) long and 31 ft wide. If it were closed, the detour would be 6.2 mi (10 km).

CarriesCounty Highway
CrossesI29/NECHE Interchange
Location3 South of Nd 59
RouteCounty Highway 0
Coordinates48.93451, -97.25794
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure7 GoodSome minor problems.
Last inspectionNovember 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment7: Better than present minimum criteria
Operating rating73.6 US tons
Inventory rating30.9 US tons

Structure

MaterialPrestressed Concrete Continuous
DeckConcrete, cast-in-place
Main spans4
Design loadHS 20
Structure length245 ft (74.7 m)
Longest span58 ft (17.7 m)
Deck width31 ft (9.4 m)
Roadway width28 ft (8.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic80 (2019)
Projected traffic80 by 2039
Trucks—
Lanes on structure2
Traffic directionTwo-way traffic
CarriesOverpass structure at an interchange
CrossesHighway
Detour if closed6.2 mi (10 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was County Highway over I29/NECHE Interchange built?

It was built in 1959, making it 66 years old in 2025. It was reconstructed in 1994.

What condition is County Highway over I29/NECHE Interchange in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2023.

How much traffic does County Highway over I29/NECHE Interchange carry?

About 80 vehicles per day (2019 count).

How long is County Highway over I29/NECHE Interchange?

The structure is 245 ft (74.7 m) long with a longest span of 58 ft (17.7 m) and a deck 31 ft wide.

Who owns County Highway over I29/NECHE Interchange?

It is owned by the State Highway Agency.