Section Line Road over Mid. Br. Douglas Creek
FairPosted for loadMcLean County, North Dakota · 14 East 1 North Roseglen · Structure no. 000000028136060
- Built
- 1936
- 89 years old
- Condition
- Fair
- inspected April 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 33 ft
- 2 main spans
- Daily traffic
- 10
- 2019 count
- Owner
- County
- County Highway Agency
About this bridge
Section Line Road over Mid. Br. Douglas Creek is a steel stringer/multi-beam or girder carrying Section Line Road over Mid. Br. Douglas Creek in McLean County, North Dakota. It was built in 1936, so it is 89 years old, older than the North Dakota average of 48.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 10 vehicles a day, projected to reach 10 by 2039. The structure is 33 ft (10.1 m) long and 24 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Section Line Road over Mid. Br. Douglas Creek built?
It was built in 1936, making it 89 years old in 2025.
What condition is Section Line Road over Mid. Br. Douglas Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2024.
How much traffic does Section Line Road over Mid. Br. Douglas Creek carry?
About 10 vehicles per day (2019 count).
How long is Section Line Road over Mid. Br. Douglas Creek?
The structure is 33 ft (10.1 m) long with a longest span of 16 ft (4.9 m) and a deck 24 ft wide.
Who owns Section Line Road over Mid. Br. Douglas Creek?
It is owned by the County Highway Agency.