Section Line Trail over Mid. Br. Douglas Creek
FairPosted for loadMcLean County, North Dakota · 6.3 West 1 South Garrison · Structure no. 000000028135152
- Built
- 1940
- 85 years old
- Condition
- Fair
- inspected April 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 30 ft
- 1 main span
- Daily traffic
- 5
- 2019 count
- Owner
- County
- County Highway Agency
About this bridge
Section Line Trail over Mid. Br. Douglas Creek is a steel stringer/multi-beam or girder carrying Section Line Trail over Mid. Br. Douglas Creek in McLean County, North Dakota. It was built in 1940, so it is 85 years old, older than the North Dakota average of 48.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 5 vehicles a day, projected to reach 5 by 2039. The structure is 30 ft (9.2 m) long and 16 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Section Line Trail over Mid. Br. Douglas Creek built?
It was built in 1940, making it 85 years old in 2025.
What condition is Section Line Trail over Mid. Br. Douglas Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2024.
How much traffic does Section Line Trail over Mid. Br. Douglas Creek carry?
About 5 vehicles per day (2019 count).
How long is Section Line Trail over Mid. Br. Douglas Creek?
The structure is 30 ft (9.2 m) long with a longest span of 30 ft (9.1 m) and a deck 16 ft wide.
Who owns Section Line Trail over Mid. Br. Douglas Creek?
It is owned by the County Highway Agency.