US Bridges

County Highway over Creek

Good

Grand Forks County, North Dakota · 1 North 4 East Thompson · Structure no. 000000018142281

Built
2020
5 years old
Condition
Good
inspected April 2023
Type
Culvert
Concrete
Length
29 ft
2 main spans
Daily traffic
45
2019 count
Owner
County
County Highway Agency

About this bridge

County Highway over Creek is a concrete culvert carrying County Highway over Creek in Grand Forks County, North Dakota. It was built in 2020, so it is 5 years old, younger than the North Dakota average of 48.2 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 45 vehicles a day, projected to reach 45 by 2039. The structure is 29 ft (8.8 m) long. If it were closed, the detour would be 1.9 mi (3 km).

CarriesCounty Highway
CrossesCreek
Location1 North 4 East Thompson
RouteCounty Highway 0
Coordinates47.78835, -97.01951
Functional classRural Local

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Channel and channel protection8 Very GoodNo problems noted.
Culvert8 Very GoodNo problems noted.
Last inspectionApril 2023
Inspection intervalevery 48 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating54.5 US tons
Inventory rating42 US tons

Structure

Structure typeCulvert
MaterialConcrete
DeckNot applicable
Main spans2
Design loadHL 93
Structure length29 ft (8.8 m)
Longest span14 ft (4.3 m)
Deck width0 ft (0 m)
Roadway width0 ft (0 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic45 (2019)
Projected traffic45 by 2039
Trucks—
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedReplacement because of substandard load-carrying capacity or roadway geometry
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was County Highway over Creek built?

It was built in 2020, making it 5 years old in 2025.

What condition is County Highway over Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in April 2023.

How much traffic does County Highway over Creek carry?

About 45 vehicles per day (2019 count).

How long is County Highway over Creek?

The structure is 29 ft (8.8 m) long with a longest span of 14 ft (4.3 m).

Who owns County Highway over Creek?

It is owned by the County Highway Agency.