US Bridges

County Highway over Coulee

Fair

Grand Forks County, North Dakota · 4 East 3 North Thompson · Structure no. 000000018142260

Built
1991
34 years old
Condition
Fair
inspected June 2023
Type
Channel Beam
Concrete
Length
31 ft
1 main span
Daily traffic
25
2019 count
Owner
County
County Highway Agency

About this bridge

County Highway over Coulee is a concrete channel beam carrying County Highway over Coulee in Grand Forks County, North Dakota. It was built in 1991, so it is 34 years old, younger than the North Dakota average of 48.2 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 25 vehicles a day, projected to reach 25 by 2039. The structure is 31 ft (9.4 m) long and 34 ft wide. If it were closed, the detour would be 1.9 mi (3 km).

CarriesCounty Highway
CrossesCoulee
Location4 East 3 North Thompson
RouteCounty Highway 0
Coordinates47.81738, -97.0203
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure7 GoodSome minor problems.
Channel and channel protection6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionJune 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourUnknown foundation; not evaluated for scour
Structural evaluation6: Equal to present minimum criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating52.2 US tons
Inventory rating31.3 US tons

Structure

Structure typeChannel Beam
MaterialConcrete
DeckNot applicable
Main spans1
Design loadHS 15
Structure length31 ft (9.4 m)
Longest span28 ft (8.5 m)
Deck width34 ft (10.4 m)
Roadway width31 ft (9.4 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic25 (2019)
Projected traffic25 by 2039
Trucks—
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.9 mi (3 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was County Highway over Coulee built?

It was built in 1991, making it 34 years old in 2025.

What condition is County Highway over Coulee in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2023.

How much traffic does County Highway over Coulee carry?

About 25 vehicles per day (2019 count).

How long is County Highway over Coulee?

The structure is 31 ft (9.4 m) long with a longest span of 28 ft (8.5 m) and a deck 34 ft wide.

Who owns County Highway over Coulee?

It is owned by the County Highway Agency.