County Highway over I94/CLEAR Lake Sep
FairBurleigh County, North Dakota · 3 East of US 83 South · Structure no. 0094186022
- Built
- 1966
- 59 years old
- Condition
- Fair
- inspected April 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 250 ft
- 4 main spans
- Daily traffic
- 25
- 2019 count
- Owner
- State
- State Highway Agency
About this bridge
County Highway over I94/CLEAR Lake Sep is a steel continuous stringer/multi-beam or girder carrying County Highway over I94/CLEAR Lake Sep in Burleigh County, North Dakota. It was built in 1966, so it is 59 years old, older than the North Dakota average of 48.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 25 vehicles a day, projected to reach 25 by 2039. The structure is 250 ft (76.2 m) long and 30 ft wide. If it were closed, the detour would be 1.9 mi (3 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was County Highway over I94/CLEAR Lake Sep built?
It was built in 1966, making it 59 years old in 2025.
What condition is County Highway over I94/CLEAR Lake Sep in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2024.
How much traffic does County Highway over I94/CLEAR Lake Sep carry?
About 25 vehicles per day (2019 count).
How long is County Highway over I94/CLEAR Lake Sep?
The structure is 250 ft (76.2 m) long with a longest span of 69 ft (21 m) and a deck 30 ft wide.
Who owns County Highway over I94/CLEAR Lake Sep?
It is owned by the State Highway Agency.