275 ST NE over Apple Creek
GoodBurleigh County, North Dakota · 3 East 8 North Mckenzie · Structure no. 000000008129280
- Built
- 1980
- 45 years old
- Condition
- Good
- inspected November 2024
- Type
- Box Beam or Girders - Single or Spread
- Prestressed Concrete
- Length
- 88 ft
- 2 main spans
- Daily traffic
- 30
- 2018 count
- Owner
- County
- County Highway Agency
About this bridge
275 ST NE over Apple Creek is a prestressed concrete box beam or girders - single or spread carrying 275 ST NE over Apple Creek in Burleigh County, North Dakota. It was built in 1980, so it is 45 years old, younger than the North Dakota average of 48.2 years.
The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
It carries about 30 vehicles a day, projected to reach 30 by 2038. The structure is 88 ft (26.8 m) long and 30 ft wide. If it were closed, the detour would be 6.2 mi (10 km).
Location
Open in Google MapsCondition and inspection
All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 8 Very Good | No problems noted. |
| Substructure | 8 Very Good | No problems noted. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was 275 ST NE over Apple Creek built?
It was built in 1980, making it 45 years old in 2025.
What condition is 275 ST NE over Apple Creek in?
The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2024.
How much traffic does 275 ST NE over Apple Creek carry?
About 30 vehicles per day (2018 count).
How long is 275 ST NE over Apple Creek?
The structure is 88 ft (26.8 m) long with a longest span of 41 ft (12.5 m) and a deck 30 ft wide.
Who owns 275 ST NE over Apple Creek?
It is owned by the County Highway Agency.