US Bridges

I795N over SR1316

Fair

Wayne County, North Carolina · 4 Mi. S. Jct. SR1002 · Structure no. 000000001910337

Built
2005
20 years old
Condition
Fair
inspected January 2025
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
90 ft
1 main span
Daily traffic
9,250
2019 count
Owner
State
State Highway Agency

About this bridge

I795N over SR1316 is a prestressed concrete stringer/multi-beam or girder carrying I795N over SR1316 in Wayne County, North Carolina. It was built in 2005, so it is 20 years old, younger than the North Carolina average of 38.7 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 9,250 vehicles a day, roughly 16% of them trucks, projected to reach 18,500 by 2040. The structure is 90 ft (27.4 m) long and 40 ft wide. If it were closed, the detour would be 0.6 mi (1 km).

CarriesI795N
CrossesSR1316
Location4 Mi. S. Jct. SR1002
RouteInterstate 795
Coordinates35.44233, -77.98433
Functional classUrban Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Last inspectionJanuary 2025
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation8: Equal to present desirable criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment8: Equal to present desirable criteria
Operating rating99 US tons
Inventory rating47 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans1
Design loadHS 20 + Mod
Structure length90 ft (27.4 m)
Longest span87 ft (26.5 m)
Deck width40 ft (12.3 m)
Roadway width37 ft (11.3 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic9,250 (2019)
Projected traffic18,500 by 2040
Trucks16%
Lanes on structure2
Traffic directionOne-way traffic
CarriesHighway
CrossesHighway
Detour if closed0.6 mi (1 km)
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I795N over SR1316 built?

It was built in 2005, making it 20 years old in 2025.

What condition is I795N over SR1316 in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2025.

How much traffic does I795N over SR1316 carry?

About 9,250 vehicles per day (2019 count), of which roughly 16% are trucks.

How long is I795N over SR1316?

The structure is 90 ft (27.4 m) long with a longest span of 87 ft (26.5 m) and a deck 40 ft wide.

Who owns I795N over SR1316?

It is owned by the State Highway Agency.