S Billings Blvd over Sep Billings Blvd-I 90
FairYellowstone County, Montana · Billings-S Billings Blvd · Structure no. U01013000+07771
- Built
- 1963
- 62 years old, rebuilt 1992
- Condition
- Fair
- inspected April 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 215 ft
- 4 main spans
- Daily traffic
- 15,780
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
S Billings Blvd over Sep Billings Blvd-I 90 is a prestressed concrete stringer/multi-beam or girder carrying S Billings Blvd over Sep Billings Blvd-I 90 in Yellowstone County, Montana. It was built in 1963 and reconstructed in 1992, so it is 62 years old, older than the Montana average of 47 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 15,780 vehicles a day, roughly 2% of them trucks, projected to reach 16,885 by 2043. The structure is 215 ft (65.5 m) long and 68 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was S Billings Blvd over Sep Billings Blvd-I 90 built?
It was built in 1963, making it 62 years old in 2025. It was reconstructed in 1992.
What condition is S Billings Blvd over Sep Billings Blvd-I 90 in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2023.
How much traffic does S Billings Blvd over Sep Billings Blvd-I 90 carry?
About 15,780 vehicles per day (2023 count), of which roughly 2% are trucks.
How long is S Billings Blvd over Sep Billings Blvd-I 90?
The structure is 215 ft (65.5 m) long with a longest span of 61 ft (18.7 m) and a deck 68 ft wide.
Who owns S Billings Blvd over Sep Billings Blvd-I 90?
It is owned by the State Highway Agency.