S Frontage RD over Hogan`s Slough
FairYellowstone County, Montana · Billings-S Frontage RD · Structure no. U01011000+09321
- Built
- 1958
- 67 years old
- Condition
- Fair
- inspected November 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 84 ft
- 2 main spans
- Daily traffic
- 2,349
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
S Frontage RD over Hogan`s Slough is a prestressed concrete stringer/multi-beam or girder carrying S Frontage RD over Hogan`s Slough in Yellowstone County, Montana. It was built in 1958, so it is 67 years old, older than the Montana average of 47 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 2,349 vehicles a day, roughly 3% of them trucks, projected to reach 2,466 by 2043. The structure is 84 ft (25.6 m) long and 30 ft wide. If it were closed, the detour would be 1.2 mi (2 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 7 Good | Some minor problems. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 7 Good | Some minor problems. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was S Frontage RD over Hogan`s Slough built?
It was built in 1958, making it 67 years old in 2025.
What condition is S Frontage RD over Hogan`s Slough in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2024.
How much traffic does S Frontage RD over Hogan`s Slough carry?
About 2,349 vehicles per day (2023 count), of which roughly 3% are trucks.
How long is S Frontage RD over Hogan`s Slough?
The structure is 84 ft (25.6 m) long with a longest span of 41 ft (12.5 m) and a deck 30 ft wide.
Who owns S Frontage RD over Hogan`s Slough?
It is owned by the State Highway Agency.