S 522 (36-30) over Huntley Canal
FairYellowstone County, Montana · 1M S Huntley · Structure no. S00522000+03681
- Built
- 1967
- 58 years old
- Condition
- Fair
- inspected November 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 72 ft
- 1 main span
- Daily traffic
- 4,332
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
S 522 (36-30) over Huntley Canal is a prestressed concrete stringer/multi-beam or girder carrying S 522 (36-30) over Huntley Canal in Yellowstone County, Montana. It was built in 1967, so it is 58 years old, older than the Montana average of 47 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 4,332 vehicles a day, roughly 2% of them trucks, projected to reach 4,549 by 2043. The structure is 72 ft (21.9 m) long and 43 ft wide. If it were closed, the detour would be 19.9 mi (32 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 5 Fair | All primary structural elements are sound but may have minor section loss, cracking, spalling or scour. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was S 522 (36-30) over Huntley Canal built?
It was built in 1967, making it 58 years old in 2025.
What condition is S 522 (36-30) over Huntley Canal in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in November 2024.
How much traffic does S 522 (36-30) over Huntley Canal carry?
About 4,332 vehicles per day (2023 count), of which roughly 2% are trucks.
How long is S 522 (36-30) over Huntley Canal?
The structure is 72 ft (21.9 m) long with a longest span of 70 ft (21.3 m) and a deck 43 ft wide.
Who owns S 522 (36-30) over Huntley Canal?
It is owned by the State Highway Agency.