US Bridges

S 7 over Beaver Creek

Good

Wibaux County, Montana · 1M S Wibaux · Structure no. 000000202105706

Built
2022
3 years old
Condition
Good
inspected August 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
178 ft
2 main spans
Daily traffic
714
2023 count
Owner
State
State Highway Agency

About this bridge

S 7 over Beaver Creek is a prestressed concrete stringer/multi-beam or girder carrying S 7 over Beaver Creek in Wibaux County, Montana. It was built in 2022, so it is 3 years old, younger than the Montana average of 47 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 714 vehicles a day, roughly 8% of them trucks, projected to reach 750 by 2043. The structure is 178 ft (54.3 m) long and 38 ft wide. If it were closed, the detour would be 1.2 mi (2 km).

CarriesS 7
CrossesBeaver Creek
Location1M S Wibaux
RouteState Highway 7
StateMontana
Coordinates46.96514, -104.18907
Functional classRural Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionAugust 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation8: Equal to present desirable criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating58.2 US tons
Inventory rating35.7 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans2
Design loadHL 93
Structure length178 ft (54.3 m)
Longest span105 ft (31.9 m)
Deck width38 ft (11.7 m)
Roadway width36 ft (11 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic714 (2023)
Projected traffic750 by 2043
Trucks8%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed1.2 mi (2 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was S 7 over Beaver Creek built?

It was built in 2022, making it 3 years old in 2025.

What condition is S 7 over Beaver Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in August 2023.

How much traffic does S 7 over Beaver Creek carry?

About 714 vehicles per day (2023 count), of which roughly 8% are trucks.

How long is S 7 over Beaver Creek?

The structure is 178 ft (54.3 m) long with a longest span of 105 ft (31.9 m) and a deck 38 ft wide.

Who owns S 7 over Beaver Creek?

It is owned by the State Highway Agency.