Snake Creek RD over Snake Creek 046
FairPosted for loadValley County, Montana · 24M N Hinsdale · Structure no. L53031002+05001
- Built
- 1986
- 39 years old
- Condition
- Fair
- inspected October 2024
- Type
- Stringer/Multi-beam or Girder
- Steel
- Length
- 76 ft
- 2 main spans
- Daily traffic
- 14
- 2023 count
- Owner
- County
- County Highway Agency
About this bridge
Snake Creek RD over Snake Creek 046 is a steel stringer/multi-beam or girder carrying Snake Creek RD over Snake Creek 046 in Valley County, Montana. It was built in 1986, so it is 39 years old, younger than the Montana average of 47 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.
It carries about 14 vehicles a day, roughly 3% of them trucks, projected to reach 15 by 2043. The structure is 76 ft (23.2 m) long and 24 ft wide. If it were closed, the detour would be 11.2 mi (18 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Snake Creek RD over Snake Creek 046 built?
It was built in 1986, making it 39 years old in 2025.
What condition is Snake Creek RD over Snake Creek 046 in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in October 2024.
How much traffic does Snake Creek RD over Snake Creek 046 carry?
About 14 vehicles per day (2023 count), of which roughly 3% are trucks.
How long is Snake Creek RD over Snake Creek 046?
The structure is 76 ft (23.2 m) long with a longest span of 52 ft (16 m) and a deck 24 ft wide.
Who owns Snake Creek RD over Snake Creek 046?
It is owned by the County Highway Agency.