US Bridges

IRR - S24 over West Fk Porcupine Creek

Good

Valley County, Montana · 18 Mile South Opheim · Structure no. 000000202405733

Built
2024
1 years old
Condition
Good
inspected November 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
114 ft
2 main spans
Daily traffic
292
2023 count
Owner
State
State Highway Agency

About this bridge

IRR - S24 over West Fk Porcupine Creek is a prestressed concrete stringer/multi-beam or girder carrying IRR - S24 over West Fk Porcupine Creek in Valley County, Montana. It was built in 2024, so it is 1 years old, younger than the Montana average of 47 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 8 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 292 vehicles a day, roughly 23% of them trucks, projected to reach 307 by 2043. The structure is 114 ft (34.7 m) long and 35 ft wide. If it were closed, the detour would be 123.7 mi (199 km).

CarriesIRR - S24
CrossesWest Fk Porcupine Creek
Location18 Mile South Opheim
RouteState Highway 24
StateMontana
Coordinates48.56216, -106.54049
Functional classRural Minor Arterial

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck8 Very GoodNo problems noted.
Superstructure8 Very GoodNo problems noted.
Substructure8 Very GoodNo problems noted.
Channel and channel protection8 Very GoodNo problems noted.
Last inspectionNovember 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour above top of footing
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Waterway adequacy6: Equal to present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating52.9 US tons
Inventory rating31.1 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans2
Design loadHL 93
Structure length114 ft (34.7 m)
Longest span57 ft (17.4 m)
Deck width35 ft (10.8 m)
Roadway width34 ft (10.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic292 (2023)
Projected traffic307 by 2043
Trucks23%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed123.7 mi (199 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was IRR - S24 over West Fk Porcupine Creek built?

It was built in 2024, making it 1 years old in 2025.

What condition is IRR - S24 over West Fk Porcupine Creek in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in November 2024.

How much traffic does IRR - S24 over West Fk Porcupine Creek carry?

About 292 vehicles per day (2023 count), of which roughly 23% are trucks.

How long is IRR - S24 over West Fk Porcupine Creek?

The structure is 114 ft (34.7 m) long with a longest span of 57 ft (17.4 m) and a deck 35 ft wide.

Who owns IRR - S24 over West Fk Porcupine Creek?

It is owned by the State Highway Agency.