Main Boulder RD over Boulder River
FairSweet Grass County, Montana · 3M NE Mcleod · Structure no. S00298013+00001
- Built
- 1950
- 75 years old
- Condition
- Fair
- inspected July 2024
- Type
- Stringer/Multi-beam or Girder
- Steel Continuous
- Length
- 153 ft
- 3 main spans
- Daily traffic
- 529
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
Main Boulder RD over Boulder River is a steel continuous stringer/multi-beam or girder carrying Main Boulder RD over Boulder River in Sweet Grass County, Montana. It was built in 1950, so it is 75 years old, older than the Montana average of 47 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 529 vehicles a day, roughly 5% of them trucks, projected to reach 555 by 2043. The structure is 153 ft (46.6 m) long and 23 ft wide. If it were closed, the detour would be 123.7 mi (199 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was Main Boulder RD over Boulder River built?
It was built in 1950, making it 75 years old in 2025.
What condition is Main Boulder RD over Boulder River in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in July 2024.
How much traffic does Main Boulder RD over Boulder River carry?
About 529 vehicles per day (2023 count), of which roughly 5% are trucks.
How long is Main Boulder RD over Boulder River?
The structure is 153 ft (46.6 m) long with a longest span of 58 ft (17.7 m) and a deck 23 ft wide.
Who owns Main Boulder RD over Boulder River?
It is owned by the State Highway Agency.