US Bridges

I 90 over Int Springtime

Fair

Stillwater County, Montana · 8M W Columbus · Structure no. I00090400+06311

Built
1971
54 years old, rebuilt 2014
Condition
Fair
inspected June 2024
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
131 ft
3 main spans
Daily traffic
5,861
2023 count
Owner
State
State Highway Agency

About this bridge

I 90 over Int Springtime is a prestressed concrete stringer/multi-beam or girder carrying I 90 over Int Springtime in Stillwater County, Montana. It was built in 1971 and reconstructed in 2014, so it is 54 years old, older than the Montana average of 47 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 5,861 vehicles a day, roughly 18% of them trucks, projected to reach 6,300 by 2043. The structure is 131 ft (39.9 m) long and 44 ft wide.

CarriesI 90
CrossesInt Springtime
Location8M W Columbus
RouteInterstate 90
StateMontana
Coordinates45.70073, -109.38886
Functional classRural Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Last inspectionJune 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation6: Equal to present minimum criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment6: Equal to present minimum criteria
Operating rating58 US tons
Inventory rating39 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length131 ft (39.9 m)
Longest span57 ft (17.4 m)
Deck width44 ft (13.5 m)
Roadway width41 ft (12.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic5,861 (2023)
Projected traffic6,300 by 2043
Trucks18%
Lanes on structure2
Traffic directionOne-way traffic
CarriesOverpass structure at an interchange
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I 90 over Int Springtime built?

It was built in 1971, making it 54 years old in 2025. It was reconstructed in 2014.

What condition is I 90 over Int Springtime in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2024.

How much traffic does I 90 over Int Springtime carry?

About 5,861 vehicles per day (2023 count), of which roughly 18% are trucks.

How long is I 90 over Int Springtime?

The structure is 131 ft (39.9 m) long with a longest span of 57 ft (17.4 m) and a deck 44 ft wide.

Who owns I 90 over Int Springtime?

It is owned by the State Highway Agency.