US Bridges

Chalk Butte RD over Plentywood Creek 009

FairClosed to traffic

Sheridan County, Montana · 5M SE Outlook · Structure no. L46005004+03001

Built
1970
55 years old, rebuilt 2004
Condition
Fair
inspected August 2024
Type
Stringer/Multi-beam or Girder
Steel
Length
71 ft
3 main spans
Daily traffic
26
2023 count
Owner
County
County Highway Agency

About this bridge

Chalk Butte RD over Plentywood Creek 009 is a steel stringer/multi-beam or girder carrying Chalk Butte RD over Plentywood Creek 009 in Sheridan County, Montana. It was built in 1970 and reconstructed in 2004, so it is 55 years old, older than the Montana average of 47 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: closed to all traffic.

It carries about 26 vehicles a day, roughly 3% of them trucks, projected to reach 27 by 2043. The structure is 71 ft (21.5 m) long and 25 ft wide. If it were closed, the detour would be 9.9 mi (16 km).

CarriesChalk Butte RD
CrossesPlentywood Creek 009
Location5M SE Outlook
RouteCounty Highway 46005
StateMontana
Coordinates48.83933, -104.73294
Functional classRural Local

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure6 SatisfactoryStructural elements show some minor deterioration.
Channel and channel protection7 GoodSome minor problems.
Last inspectionAugust 2024
Inspection intervalevery 24 months
Operating statusClosed to all traffic
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation4: Meets minimum tolerable limits to be left in place as is
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy5: Somewhat better than minimum adequacy to tolerate being left in place as is
Approach roadway alignment6: Equal to present minimum criteria
Operating rating19 US tons
Inventory rating13 US tons

Structure

MaterialSteel
DeckWood or timber
Main spans3
Design loadUnknown
Structure length71 ft (21.5 m)
Longest span26 ft (7.9 m)
Deck width25 ft (7.6 m)
Roadway width21 ft (6.5 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic26 (2023)
Projected traffic27 by 2043
Trucks3%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed9.9 mi (16 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerCounty Highway Agency
Maintained byCounty Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Chalk Butte RD over Plentywood Creek 009 built?

It was built in 1970, making it 55 years old in 2025. It was reconstructed in 2004.

What condition is Chalk Butte RD over Plentywood Creek 009 in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in August 2024.

How much traffic does Chalk Butte RD over Plentywood Creek 009 carry?

About 26 vehicles per day (2023 count), of which roughly 3% are trucks.

How long is Chalk Butte RD over Plentywood Creek 009?

The structure is 71 ft (21.5 m) long with a longest span of 26 ft (7.9 m) and a deck 25 ft wide.

Who owns Chalk Butte RD over Plentywood Creek 009?

It is owned by the County Highway Agency.