No Data Entered over Vermilion River
PoorSanders County, Montana · Seven Point Mtn · Structure no. 011407000000227
- Built
- 1959
- 66 years old
- Condition
- Poor
- inspected July 2024
- Type
- Stringer/Multi-beam or Girder
- Wood or Timber
- Length
- 45 ft
- 1 main span
- Daily traffic
- 50
- 1993 count
- Owner
- Federal
- U.S. Forest Service
About this bridge
No Data Entered over Vermilion River is a wood or timber stringer/multi-beam or girder carrying No Data Entered over Vermilion River in Sanders County, Montana. It was built in 1959, so it is 66 years old, older than the Montana average of 47 years.
The most recent inspection reported to the Federal Highway Administration rates it in poor condition with a lowest component rating of 4 out of 9. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
It carries about 50 vehicles a day, projected to reach 75 by 2045. The structure is 45 ft (13.7 m) long and 15 ft wide. If it were closed, the detour would be 98.2 mi (158 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Substructure | 4 Poor | Advanced section loss, deterioration, spalling or scour. |
| Channel and channel protection | 8 Very Good | No problems noted. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was No Data Entered over Vermilion River built?
It was built in 1959, making it 66 years old in 2025.
What condition is No Data Entered over Vermilion River in?
The National Bridge Inventory rates it in poor condition. The lowest-rated primary component is rated 4 or below, indicating advanced deterioration. Poor does not mean unsafe; such bridges are inspected more often and may carry load restrictions. The last reported inspection was in July 2024.
How much traffic does No Data Entered over Vermilion River carry?
About 50 vehicles per day (1993 count).
How long is No Data Entered over Vermilion River?
The structure is 45 ft (13.7 m) long with a longest span of 44 ft (13.4 m) and a deck 15 ft wide.
Who owns No Data Entered over Vermilion River?
It is owned by the U.S. Forest Service.