S 16 over Usbr Main Canal
FairRichland County, Montana · 4M SW Crane · Structure no. P00020037+05151
- Built
- 1984
- 41 years old
- Condition
- Fair
- inspected January 2023
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 92 ft
- 1 main span
- Daily traffic
- 2,821
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
S 16 over Usbr Main Canal is a prestressed concrete stringer/multi-beam or girder carrying S 16 over Usbr Main Canal in Richland County, Montana. It was built in 1984, so it is 41 years old, younger than the Montana average of 47 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 2,821 vehicles a day, roughly 11% of them trucks, projected to reach 2,976 by 2043. The structure is 92 ft (27.9 m) long and 42 ft wide. If it were closed, the detour would be 65.9 mi (106 km).
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 6 Satisfactory | Structural elements show some minor deterioration. |
| Channel and channel protection | 6 Satisfactory | Structural elements show some minor deterioration. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was S 16 over Usbr Main Canal built?
It was built in 1984, making it 41 years old in 2025.
What condition is S 16 over Usbr Main Canal in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in January 2023.
How much traffic does S 16 over Usbr Main Canal carry?
About 2,821 vehicles per day (2023 count), of which roughly 11% are trucks.
How long is S 16 over Usbr Main Canal?
The structure is 92 ft (27.9 m) long with a longest span of 90 ft (27.4 m) and a deck 42 ft wide.
Who owns S 16 over Usbr Main Canal?
It is owned by the State Highway Agency.