I 90 EB over Int Gold Creek
FairPowell County, Montana · Gold Creek · Structure no. I00090166+02721
- Built
- 1959
- 66 years old, rebuilt 2004
- Condition
- Fair
- inspected June 2024
- Type
- Stringer/Multi-beam or Girder
- Prestressed Concrete
- Length
- 155 ft
- 3 main spans
- Daily traffic
- 5,992
- 2023 count
- Owner
- State
- State Highway Agency
About this bridge
I 90 EB over Int Gold Creek is a prestressed concrete stringer/multi-beam or girder carrying I 90 EB over Int Gold Creek in Powell County, Montana. It was built in 1959 and reconstructed in 2004, so it is 66 years old, older than the Montana average of 47 years.
The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
It carries about 5,992 vehicles a day, roughly 18% of them trucks, projected to reach 6,381 by 2043. The structure is 155 ft (47.2 m) long and 40 ft wide.
Location
Open in Google MapsCondition and inspection
The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.
| Component | Rating | Meaning |
|---|---|---|
| Deck | 6 Satisfactory | Structural elements show some minor deterioration. |
| Superstructure | 7 Good | Some minor problems. |
| Substructure | 7 Good | Some minor problems. |
Structure
Traffic and service
Ownership and planned work
Frequently asked questions
When was I 90 EB over Int Gold Creek built?
It was built in 1959, making it 66 years old in 2025. It was reconstructed in 2004.
What condition is I 90 EB over Int Gold Creek in?
The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in June 2024.
How much traffic does I 90 EB over Int Gold Creek carry?
About 5,992 vehicles per day (2023 count), of which roughly 18% are trucks.
How long is I 90 EB over Int Gold Creek?
The structure is 155 ft (47.2 m) long with a longest span of 61 ft (18.6 m) and a deck 40 ft wide.
Who owns I 90 EB over Int Gold Creek?
It is owned by the State Highway Agency.