US Bridges

US 212 over Powder River

Good

Powder River County, Montana · 1M SE Broadus · Structure no. P00023080+05591

Built
1985
40 years old
Condition
Good
inspected June 2024
Type
Stringer/Multi-beam or Girder
Steel Continuous
Length
625 ft
4 main spans
Daily traffic
2,084
2023 count
Owner
State
State Highway Agency

About this bridge

US 212 over Powder River is a steel continuous stringer/multi-beam or girder carrying US 212 over Powder River in Powder River County, Montana. It was built in 1985, so it is 40 years old, younger than the Montana average of 47 years.

The most recent inspection reported to the Federal Highway Administration rates it in good condition with a lowest component rating of 7 out of 9. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

It carries about 2,084 vehicles a day, roughly 35% of them trucks, projected to reach 2,313 by 2043. The structure is 625 ft (190.5 m) long and 42 ft wide. If it were closed, the detour would be 123.7 mi (199 km).

CarriesUS 212
CrossesPowder River
Location1M SE Broadus
RouteU.S. Route 212
StateMontana
Coordinates45.42819, -105.40444
Functional classRural Principal Arterial - Other

Condition and inspection

Good

All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Channel and channel protection5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Last inspectionJune 2024
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation7: Better than present minimum criteria
Deck geometry5: Somewhat better than minimum adequacy to tolerate being left in place as is
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating68 US tons
Inventory rating41 US tons

Structure

MaterialSteel Continuous
DeckConcrete, cast-in-place
Main spans4
Design loadHS 20
Structure length625 ft (190.5 m)
Longest span172 ft (52.5 m)
Deck width42 ft (12.9 m)
Roadway width39 ft (12 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic2,084 (2023)
Projected traffic2,313 by 2043
Trucks35%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed123.7 mi (199 km)
TollOn a free road
National Highway SystemYes

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was US 212 over Powder River built?

It was built in 1985, making it 40 years old in 2025.

What condition is US 212 over Powder River in?

The National Bridge Inventory rates it in good condition. All primary components (deck, superstructure, substructure, or culvert) are rated 7 or higher. No significant problems were noted. The last reported inspection was in June 2024.

How much traffic does US 212 over Powder River carry?

About 2,084 vehicles per day (2023 count), of which roughly 35% are trucks.

How long is US 212 over Powder River?

The structure is 625 ft (190.5 m) long with a longest span of 172 ft (52.5 m) and a deck 42 ft wide.

Who owns US 212 over Powder River?

It is owned by the State Highway Agency.