US Bridges

Sollid RD over Pondera Coulee

FairPosted for load

Pondera County, Montana · 10M E Conrad · Structure no. S00218010+07001

Built
1964
61 years old
Condition
Fair
inspected September 2023
Type
Stringer/Multi-beam or Girder
Wood or Timber
Length
60 ft
2 main spans
Daily traffic
69
2023 count
Owner
State
State Highway Agency

About this bridge

Sollid RD over Pondera Coulee is a wood or timber stringer/multi-beam or girder carrying Sollid RD over Pondera Coulee in Pondera County, Montana. It was built in 1964, so it is 61 years old, older than the Montana average of 47 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 5 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. Its operating status is: posted for load restriction.

It carries about 69 vehicles a day, projected to reach 72 by 2043. The structure is 60 ft (18.3 m) long and 28 ft wide. If it were closed, the detour would be 11.8 mi (19 km).

CarriesSollid RD
CrossesPondera Coulee
Location10M E Conrad
RouteState Highway 218
StateMontana
Coordinates48.17496, -111.71734
Functional classRural Major Collector

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck7 GoodSome minor problems.
Superstructure6 SatisfactoryStructural elements show some minor deterioration.
Substructure5 FairAll primary structural elements are sound but may have minor section loss, cracking, spalling or scour.
Channel and channel protection7 GoodSome minor problems.
Last inspectionSeptember 2023
Inspection intervalevery 24 months
Operating statusPosted for load restriction
ScourFoundations stable; scour within limits of footing or piles
Structural evaluation5: Somewhat better than minimum adequacy to tolerate being left in place as is
Deck geometry6: Equal to present minimum criteria
Waterway adequacy8: Equal to present desirable criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating32 US tons
Inventory rating21.1 US tons

Structure

MaterialWood or Timber
DeckWood or timber
Main spans2
Design loadUnknown
Structure length60 ft (18.3 m)
Longest span29 ft (8.8 m)
Deck width28 ft (8.5 m)
Roadway width26 ft (7.9 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic69 (2023)
Projected traffic72 by 2043
Trucks0%
Lanes on structure2
Traffic directionTwo-way traffic
CarriesHighway
CrossesWaterway
Detour if closed11.8 mi (19 km)
TollOn a free road
National Highway SystemNo

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNo navigation control on waterway

Frequently asked questions

When was Sollid RD over Pondera Coulee built?

It was built in 1964, making it 61 years old in 2025.

What condition is Sollid RD over Pondera Coulee in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in September 2023.

How much traffic does Sollid RD over Pondera Coulee carry?

About 69 vehicles per day (2023 count).

How long is Sollid RD over Pondera Coulee?

The structure is 60 ft (18.3 m) long with a longest span of 29 ft (8.8 m) and a deck 28 ft wide.

Who owns Sollid RD over Pondera Coulee?

It is owned by the State Highway Agency.