US Bridges

I 90 over Int Sloway

Fair

Mineral County, Montana · 3.7M E St. Regis · Structure no. I00090037+02012

Built
1978
47 years old
Condition
Fair
inspected April 2023
Type
Stringer/Multi-beam or Girder
Prestressed Concrete
Length
128 ft
3 main spans
Daily traffic
3,559
2023 count
Owner
State
State Highway Agency

About this bridge

I 90 over Int Sloway is a prestressed concrete stringer/multi-beam or girder carrying I 90 over Int Sloway in Mineral County, Montana. It was built in 1978, so it is 47 years old, younger than the Montana average of 47 years.

The most recent inspection reported to the Federal Highway Administration rates it in fair condition with a lowest component rating of 6 out of 9. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

It carries about 3,559 vehicles a day, roughly 28% of them trucks, projected to reach 3,736 by 2043. The structure is 128 ft (39 m) long and 44 ft wide.

CarriesI 90
CrossesInt Sloway
Location3.7M E St. Regis
RouteInterstate 90
StateMontana
Coordinates47.25413, -115.05282
Functional classRural Principal Arterial - Interstate

Condition and inspection

Fair

The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound.

ComponentRatingMeaning
Deck6 SatisfactoryStructural elements show some minor deterioration.
Superstructure7 GoodSome minor problems.
Substructure7 GoodSome minor problems.
Last inspectionApril 2023
Inspection intervalevery 24 months
Operating statusOpen, no restriction
ScourBridge not over waterway
Structural evaluation7: Better than present minimum criteria
Deck geometry7: Better than present minimum criteria
Approach roadway alignment8: Equal to present desirable criteria
Operating rating60 US tons
Inventory rating37 US tons

Structure

MaterialPrestressed Concrete
DeckConcrete, cast-in-place
Main spans3
Design loadHS 20
Structure length128 ft (39 m)
Longest span61 ft (18.6 m)
Deck width44 ft (13.4 m)
Roadway width41 ft (12.6 m)
Vertical clearance over deckUnrestricted

Traffic and service

Average daily traffic3,559 (2023)
Projected traffic3,736 by 2043
Trucks28%
Lanes on structure2
Traffic directionOne-way traffic
CarriesOverpass structure at an interchange
CrossesHighway
Detour if closed—
TollOn a free road
National Highway SystemYes
Strategic Highway NetworkInterstate STRAHNET route

Ownership and planned work

OwnerState Highway Agency
Maintained byState Highway Agency
Historic statusNot eligible for the National Register of Historic Places
Work proposedNone recorded
Estimated improvement cost—
NavigationNot applicable (no waterway)

Frequently asked questions

When was I 90 over Int Sloway built?

It was built in 1978, making it 47 years old in 2025.

What condition is I 90 over Int Sloway in?

The National Bridge Inventory rates it in fair condition. The lowest-rated primary component is rated 5 or 6. Minor deterioration is present but the structure is sound. The last reported inspection was in April 2023.

How much traffic does I 90 over Int Sloway carry?

About 3,559 vehicles per day (2023 count), of which roughly 28% are trucks.

How long is I 90 over Int Sloway?

The structure is 128 ft (39 m) long with a longest span of 61 ft (18.6 m) and a deck 44 ft wide.

Who owns I 90 over Int Sloway?

It is owned by the State Highway Agency.